The ITER 2024 baseline involves a switch of the armour material of the First Wall (FW) from Beryllium to Tungsten and the introduction of a new “Start of Research Operations” (SRO) phase with an inertially cooled First Wall.
This talk will summarize the role of the blanket system in the ITER project, the status of design and production, and the remaining engineering tasks and challenges, especially those incurred as a result of the new ITER baseline.
Présenté par / Presented by :
Ryan Hunt
Blanket Project Leader, ITER